Friday, 26 January 2018

Siemens consortium to build 1.3-GW power plant in Brazil

Acu Port, Brazil Acu Port, Brazil

Prumo Logística has said that its subsidiary, Gás Natural Açu (GNA), has hired a consortium formed by Siemens and Andrade Gutierrez to build a 1,238-MW thermal power plant, based on imported LNG, in the Port of Açu in the Brazilian state of Rio de Janeiro. Construction is expected to start in Q1-2018.

Subscriber content
  Full content is available only to subscribers
please log in below or subscribe now
Or request to register for a free 14 day trial here